pH Adjustment System - Install Service - ZimVie
On-site system installation services include all onsite system plumbing, fittings required, startup and training as well as linking to evaporator. This includes linking customer supplied sump tank to treatment tank and to evaporator utilizing 2in sch80 PVC.
Includes unistrut and liquid tight connections where required.
Install time 4-5 days.